// The project

At 11th stop Nkoabang, in the municipality of Nkol Afamba, Citiva Consult designed and built a 192 m² R+1 duplex, from setting out to rendering.

Project overview

On a 192 m² footprint, this duplex makes the most of every square metre. The ground floor has a hall with veranda, a living room, a dining room, a kitchen with pantry and terrace, a guest toilet and a guest bedroom with shower.

The upper floor is dedicated to private life: a hall, a living room with balcony, a master bedroom with balcony, walk-in closet and shower, and two bedrooms with walk-in closets and a shared shower. The contemporary architecture plays with volumes and colours.

Project gallery

07 photos
192 m² R+1 Duplex In Nkoabang, Nkol Afamba, photo 1
192 m² R+1 Duplex In Nkoabang, Nkol Afamba, photo 2
192 m² R+1 Duplex In Nkoabang, Nkol Afamba, photo 3
192 m² R+1 Duplex In Nkoabang, Nkol Afamba, photo 4
192 m² R+1 Duplex In Nkoabang, Nkol Afamba, photo 5
192 m² R+1 Duplex In Nkoabang, Nkol Afamba, photo 6
192 m² R+1 Duplex In Nkoabang, Nkol Afamba, photo 7

Context and objectives

The client wanted a modern, functional home on a medium-sized plot. Three objectives guided the project:

  • Fit a complete family programme on a compact footprint.
  • Give the building contemporary, bright architecture.
  • Build a solid structure that matches the approved drawings.
A small footprint leaves no room for approximation: precise setting out of the footings ensures every room has exactly the planned area.

Scope of work

  • Architectural design and renderings.
  • Reinforced-concrete structural design.
  • Setting out and excavating the footings.
  • Ground-floor walls.
  • Ground-floor slab.
  • Upper-floor walls and rendering.

Our approach

Contemporary architecture

The renderings allowed the client to approve the volumes, colours and openings of the façade before works began.

Setting out and foundations

The footings were set out and excavated according to the drawings, before reinforcing and pouring the foundations.

Walls and slab

The ground-floor walls were raised, then the slab was formed and poured. The upper floor followed the same sequence before the façades were rendered.

Quality, safety and follow-up

Every critical step, from setting out to pouring concrete, was checked before moving on: reinforcement, formwork, levels and alignments. Any deviation could therefore be corrected while it was still simple and inexpensive to do so.

Site safety was organised from day one: personal protective equipment, stable scaffolding, marked-off hazard areas and a tidy site. The client was kept informed about progress, quality and the decisions to be made throughout the works.

Results

  • A 192 m² R+1 duplex that matches the approved design.
  • A complete family programme on a compact footprint.
  • Rendered façades, ready for finishing.

This project shows what Citiva Consult brings to its clients: the rigour of an engineering office combined with the know-how of a construction contractor, delivering durable works across Cameroon.