Anti-Overturning Structure Foundations At CIMENCAM Nomayos Plant
Building Works

Anti-Overturning Structure Foundations At CIMENCAM Nomayos Plant

CIMENCAM Nomayos plant

Client
CIMENCAM
Location
CIMENCAM Nomayos plant
Category
Building Works
Project Size
Industrial site
// The project

For CIMENCAM, Citiva Consult cast the foundation blocks at the base of the anti-overturning structure in the material unloading hall of the Nomayos plant.

Project overview

In the material unloading hall of the Nomayos plant, the anti-overturning structure protects equipment and staff during unloading operations. Citiva Consult cast the concrete blocks that anchor this structure at its base.

This kind of work, discreet but essential, determines the safety of the whole installation: a poorly sized or poorly executed foundation block would compromise the structure.

Project gallery

03 photos
Anti-Overturning Structure Foundations At CIMENCAM Nomayos Plant, photo 1
Anti-Overturning Structure Foundations At CIMENCAM Nomayos Plant, photo 2
Anti-Overturning Structure Foundations At CIMENCAM Nomayos Plant, photo 3

Context and objectives

CIMENCAM needed a company able to work inside an operating plant while meeting its safety requirements. Three objectives guided the work:

  • Build foundation blocks that meet the client's technical requirements.
  • Work safely in an active industrial environment.
  • Keep disruption to plant operations to a minimum.
On an industrial site, safety comes first: before each intervention, the teams reviewed the risks and the plant's own safety rules.

Scope of work

  • Preparing and marking off the work area.
  • Reinforcing the foundation blocks.
  • Forming the foundation blocks.
  • Pouring concrete at the base of the anti-overturning structure.
  • Striking formwork and restoring the area.

Our approach

Preparing the work

The work area was marked off and organised with the plant teams, to clearly separate the site from traffic routes and ongoing activities.

Reinforcement and formwork

Reinforcement and formwork were installed and inspected before any pour, in line with the client's requirements.

Pouring and restoration

Concrete was poured at the base of the structure, then the area was restored so normal operations could resume.

Quality, safety and follow-up

Each step was checked before moving on, and the teams wore the protective equipment required on site: helmet, vest, safety shoes and high-visibility clothing.

The work was coordinated with plant managers to comply with site rules and minimise the impact on production.

Results

  • Concrete foundation blocks built at the base of the anti-overturning structure.
  • Work carried out safely inside an operating plant.
  • An area restored at the end of the works.

This work for CIMENCAM shows Citiva Consult's ability to operate on industrial sites, with the rigour and safety standards they demand.

192 m² R+1 Duplex In Nkoabang, Nkol Afamba
Next Project

192 m2 R+1 Duplex In Nkoabang, Nkol Afamba