// The project

In Bonadiwoto, Douala, Citiva Consult carried out the study and construction of an R+3 building topped by a penthouse, from setting out to rendering the façades.

Project overview

The project is an R+3 building with a penthouse: one T4 apartment on each of the three upper floors, identical from one level to the next, and a penthouse on the fourth level.

Stacking identical apartments simplifies the structure and services, but requires great precision: every column and slab must line up perfectly from one level to the next to carry the penthouse safely.

Citiva Consult handled the project from design to construction, with a continuous presence on site.

Project gallery

09 photos
R+3 Building With Penthouse In Bonadiwoto, Douala, photo 1
R+3 Building With Penthouse In Bonadiwoto, Douala, photo 2
R+3 Building With Penthouse In Bonadiwoto, Douala, photo 3
R+3 Building With Penthouse In Bonadiwoto, Douala, photo 4
R+3 Building With Penthouse In Bonadiwoto, Douala, photo 5
R+3 Building With Penthouse In Bonadiwoto, Douala, photo 6
R+3 Building With Penthouse In Bonadiwoto, Douala, photo 7
R+3 Building With Penthouse In Bonadiwoto, Douala, photo 8
R+3 Building With Penthouse In Bonadiwoto, Douala, photo 9

Context and objectives

The client wanted a high-end building in Douala, with spacious homes and an exceptional top floor. Three objectives guided the project:

  • Design comfortable, identical T4 apartments on floors 1 to 3.
  • Crown the building with a penthouse, without compromising structural safety.
  • Deliver a reinforced-concrete structure that matches the drawings and is ready for finishing.
On a multi-storey building, everything depends on the foundations: setting out and footing reinforcement determine the safety of every floor built above.

Scope of work

  • Architectural design and renderings.
  • Reinforced-concrete structural modelling and analysis.
  • Setting out and excavation.
  • Reinforcing and casting the footings.
  • Formwork and casting of the first- and second-floor slabs.
  • Masonry and rendering of the façades.

Our approach

Design and modelling

The building was modelled in 3D to coordinate architecture and structure. The structural model was used to size columns, beams and slabs before works began.

Setting out and foundations

The building axes were set out and checked against the drawings. Footing reinforcement was inspected before each pour, on a site where water required particular care.

The structure, floor by floor

Slabs were formed, reinforced and poured one level at a time, always following the same inspection sequence. Rendering the façades then gave the building its final appearance.

Quality, safety and follow-up

Every critical step, from setting out to pouring concrete, was checked before moving on: reinforcement, formwork, levels and alignments. Any deviation could therefore be corrected while it was still simple and inexpensive to do so.

Site safety was organised from day one: personal protective equipment, stable scaffolding, marked-off hazard areas and a tidy site. The client was kept informed about progress, quality and the decisions to be made throughout the works.

Results

  • An R+3 building with penthouse that matches the approved drawings.
  • Four homes, including a penthouse on the top floor.
  • A structure checked at every stage and ready for finishing.

This project shows what Citiva Consult brings to its clients: the rigour of an engineering office combined with the know-how of a construction contractor, delivering durable works across Cameroon.