Ultra-Modern Duplex In Obak, Okola
Building Works

Ultra-Modern Duplex In Obak, Okola

Obak, Okola

Client
Private client
Location
Obak, Okola
Category
Building Works
Project Size
Duplex · ongoing
// The project

In Obak, in the municipality of Okola, Citiva Consult is building an ultra-modern duplex for a private client. The project is currently under way.

Project overview

This contemporary duplex was first the subject of a preliminary design (APS) by Citiva Consult, which set the architecture, floor areas and main technical principles of the building.

Works began with setting out and foundations. At this stage, the foundations, ground beams and column starters are in place.

Project gallery

06 photos
Ultra-Modern Duplex In Obak, Okola, photo 1
Ultra-Modern Duplex In Obak, Okola, photo 2
Ultra-Modern Duplex In Obak, Okola, photo 3
Ultra-Modern Duplex In Obak, Okola, photo 4
Ultra-Modern Duplex In Obak, Okola, photo 5
Ultra-Modern Duplex In Obak, Okola, photo 6

Context and objectives

The client wanted a resolutely modern home on the outskirts of Yaoundé, and a partner able to support them from design to construction. Three objectives guide the project:

  • Turn contemporary architecture into a technically sound project.
  • Involve the client at every important stage of the works.
  • Lay solid foundations for a durable building.
The Obak project is ongoing: this page will be updated as the works progress.

Scope of work

  • Preliminary design (APS).
  • Setting out the building.
  • Excavation and foundations.
  • Ground beams and column starters.
  • Site follow-up with the client.

Our approach

The preliminary design

The APS set, together with the client, the layout of spaces, the look of the façades and the structural principles before works began.

Setting out and foundations

The building was set out on site, then excavation and foundations were carried out according to the drawings.

A client involved on site

Site meetings allow the client to follow progress and approve the key stages.

Quality, safety and follow-up

Every critical step, from setting out to pouring concrete, was checked before moving on: reinforcement, formwork, levels and alignments. Any deviation could therefore be corrected while it was still simple and inexpensive to do so.

Site safety was organised from day one: personal protective equipment, stable scaffolding, marked-off hazard areas and a tidy site. The client was kept informed about progress, quality and the decisions to be made throughout the works.

Results

  • A preliminary design approved by the client.
  • Foundations, ground beams and column starters completed.
  • Works continuing with regular follow-up.

This project shows what Citiva Consult brings to its clients: the rigour of an engineering office combined with the know-how of a construction contractor, delivering durable works across Cameroon.