18-Home R+1 Development In Bikok For SCI DOA
Building Works

18-Home R+1 Development In Bikok For SCI DOA

Bikok, Ngoulemakong

Client
SCI DOA
Location
Bikok, Ngoulemakong
Category
Building Works
Project Size
18 R+1 homes
// The project

For SCI DOA, Citiva Consult is building an 18-home R+1 development in Bikok, in the municipality of Ngoulemakong.

Project overview

This housing programme brings together 18 R+1 homes on a single site. Building several identical blocks in parallel saves time, provided teams, supplies and inspections are rigorously organised.

The site has a site office where coordination meetings between the teams and the client are held.

Project gallery

05 photos
18-Home R+1 Development In Bikok For SCI DOA, photo 1
18-Home R+1 Development In Bikok For SCI DOA, photo 2
18-Home R+1 Development In Bikok For SCI DOA, photo 3
18-Home R+1 Development In Bikok For SCI DOA, photo 4
18-Home R+1 Development In Bikok For SCI DOA, photo 5

Context and objectives

SCI DOA wanted to deliver a consistent housing development within a controlled timeframe. Three objectives guide the project:

  • Build 18 identical homes with consistent quality.
  • Run an efficient multi-building site.
  • Keep the client regularly informed of progress.
In a housing programme, repetition is a strength: once the method is proven on the first building, it is reproduced identically on the next ones.

Scope of work

  • Setting out the buildings on site.
  • Foundations and reinforced-concrete frames.
  • Masonry of the homes.
  • Setting up the site office.
  • Coordination meetings and site supervision.

Our approach

An organised site

A site office was set up to host the teams and site meetings, and to organise supplies.

Buildings built in series

The homes are built using the same method, applied building after building, to ensure consistent quality.

Coordination and follow-up

Regular meetings bring together the teams and the client to track the progress of each building and quickly resolve technical points.

Quality, safety and follow-up

Every critical step, from setting out to pouring concrete, was checked before moving on: reinforcement, formwork, levels and alignments. Any deviation could therefore be corrected while it was still simple and inexpensive to do so.

Site safety was organised from day one: personal protective equipment, stable scaffolding, marked-off hazard areas and a tidy site. The client was kept informed about progress, quality and the decisions to be made throughout the works.

Results

  • An 18-home R+1 development under construction.
  • A consistent construction method across all buildings.
  • A client informed at every stage.

This project shows what Citiva Consult brings to its clients: the rigour of an engineering office combined with the know-how of a construction contractor, delivering durable works across Cameroon.